Archbold Renovations Driveway and Sidewalk Closure

Beginning Tuesday, April 9, 2018, the driveway and sidewalk between the Carrier Dome and Archbold Gymnasium will be closed to all pedestrians and vehicular traffic. This closure is anticipated to be in place from April 9, 2018 until the completion of the Archbold Gymnasium renovation project in August 2019. This area will be open temporarily for Commencement activities May 11, 2018 to May 14, 2018.

During the closure period, pedestrians will be required to travel along the south side of Forestry Drive and the east side of Sims Drive as shown on the map below. Access and egress from the Q1 lot will be allowed from the north side of campus up South Crouse Drive, only. Pedestrians and drivers should observe and follow construction signs and refer to this notification for updates.

Beginning May 14, 2018, Sims Drive between Archbold and Flanagan is scheduled to be closed for utility work through the summer until August 20, 2018.

If you have any construction-related questions, comments or suggestions, please email cpdc@syr.edu. For parking concerns, call Parking and Transit Services at 315-443-4652.

If you have questions pertaining to accessibility, contact the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-4018, ADA@syr.edu, or equalopp@syr.edu

 

 

Quad 1 North Sidewalk and Parking Closure

Beginning Monday, February 12th, portions of sidewalks and parking spaces at the west end of Quad 1 North parking lot (adjacent to Heroy, Falk and Holden Observatory) will be closed. See the map below for areas of potential closure. Temporary pedestrian walkways will be maintained in the area. Traffic flow will also be maintained through the area, however slight delays may occur when one-way traffic is required with flaggers. The construction is planned for completion in mid-April.

The area of the sidewalk and parking space closures will change as construction progresses. Pedestrians should observe and follow construction signs and refer to this notification for updates.

If you have any construction-related questions, comments or suggestions, please email cpdc@syr.edu. For parking concerns, call Parking and Transit Services at 315-443-4652.

If you have questions pertaining to accessibility, contact the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-4018, ADA@syr.edu, or equalopp@syr.edu

Construction Area Map of Temporary Pedestrian Walkways

Newhouse III Sidewalk and Loading Dock Closure

Beginning Monday, February 12th, construction will be occurring in and around the Newhouse III lawn and loading dock area. See the map below for areas of impact. Access to the loading dock and parking spaces in the semi-circle and loading dock area will be impacted over Spring Break (March 10 to March 18). The construction is planned for completion in mid-April.

The area of disturbance will change as construction progresses. Pedestrians should observe and follow construction signs and refer to this notification for updates.

If you have any construction-related questions, comments or suggestions, please email cpdc@syr.edu. For parking concerns, call Parking and Transit Services at 315-443-4652.

If you have questions pertaining to accessibility, contact the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-4018, ADA@syr.edu, or equalopp@syr.edu

Construction Map of Newhouse III Fencing

 

 

Women’s Building Sidewalk and Lighting Improvements

Beginning Monday, November 6th through November 19th sidewalk and lighting improvements will be under construction from the Sims Drive / Euclid Ave. intersection to the Women’s Building north parking lot. During this time this section of sidewalk will be closed to pedestrians. Pedestrians shall use the sidewalk along Comstock Ave. and Euclid Ave. when traveling in this area.

If you have any construction-related questions, comments or suggestions, please email cpdc@syr.edu. If you have questions pertaining to accessibility, contact Aaron Hodukavich, Director and ADA coordinator in the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-2377 or ajhoduka@syr.edu.

 

 

Irving Garage South Stairwell and Elevator Repairs

On Wednesday, July 12, masonry rehabilitation in the Irving Garage South Stairwell will begin.  Based on this work, the elevator and stairwell will not be accessible. This work will begin on July 12, 2017 at 6:00 am and is expected to last through July 28, 2017 end of business. Alternative arrangements should be made for anyone who normally uses the east stairwell and elevator. The bridge from the garage across Irving Ave. will be accessible for use during the entire duration of the project.

We are providing advance notice so that you have the opportunity to make modifications/adjustments to your work if necessary.

Our office will provide additional information regarding the proposed work as it becomes available.  Please contact Carmen Luppino, Project Manager, at 315-256-5184 or caluppin@syr.edu with any questions or concerns.  For parking concerns, call Parking and Transit Services at 315-443-4652.  If you have questions pertaining to accessibility, contact Aaron Hodukavich, Director and ADA coordinator in the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-2377 or ajhoduka@syr.edu.

We apologize for any inconvenience this may cause, and hope that you join us in looking forward to the improvements on our campus.

Irving Garage Summer 2017 Staging Map