Projects

CAMPUS WIDE 

Americans with Disabilities Act (ADA) Compliance Study Throughout Campus
Project Manager: Kim Cirman

Replace & Upgrade Existing Electrical Meters in Several Campus Buildings
Project Manager: James Peterson

Installation of Accessible Furnishings and Accommodations
Project Manager: Chris Danek

Fiber & Infrastructure Installations/Modfications to Support ACC Network
Project Manager: David Warren

-Adams Street
-Booth Hall
-Brewster Brockway
-Irving Avenue
-Lawrinson
-University Avenue

Project Manager: Kim Cirman

Repairs and Improvements to Surface Parking Lots
Project Manager: Kim Cirman

Replace Flooring in Several Campus Locations
Project Manager: Kim Cirman

Duct Cleaning
-Shaw Hall
-Skyhalls 1, 2 & 3
Project Manager: Tim Robinson

Security Screen Installation
-Watson
-Kimmel
-Day
Project Manager: Tim Robinson

Upgrade Electric Feed and Emergency Power
Project Manager: James Peterson

Replace Transformers at 210, 211, 431 and 441 Chinook Drive
Project Manager: Tim Robinson

 

 

BUILDING SPECIFIC 

Chiller Replacement
Project Manager: Kim Cirman

Flat Roof Replacement
Project Manager: Leonard Shanes

Network Wiring
Security Cameras/Card Access Additions
Project Manager: Kim Cirman

ADA Bathroom Renovations
Project Manager: Leonard Shanes

Fire Alarm and Exit Signage Replacement
Project Manager: Jim Blum

Academic Success Center – Room 348
Project Manager: Chris Danek

Stair Hand Railing & Flooring Replacement
Project Manager: Tim Robinson

Waverly Avenue Utility Expansion and Renewal
-Install chilled water, power & data
-Sanitary sewer and water main improvements
-Relocate and modify bus stops
Project Manager: David Warren

Public Space Renovations
-Heating system conversion
-Library collaboration rooms
Project Manager: Jim Blum

Replace & Reconfigure Valves for Geothermal Walls/Dynalene Repairs
Project Manager: Jim Alfiere

Masonry Restoration
-Bell tower demi-domes and building cupolas
Project Manager: Jim Blum

Sloped Glazing Repair
-Room 400 glass skylight
Project Manager: Jim Blum

Roof Replacement
Project Manager: Kim Cirman

 

Bathroom Renovations
-Conversion to accessible single user bathrooms
Project Manager: Mike Haggerty

Renovations
-East/West wing single user bathroom conversion
-Floors 2-8 room conversions
Project Manager: Mike Haggerty

Updates
-Suite entries
-Suite 217
Project Manager: Kim Cirman

4th Floor Stacks Buildout
Project Manager: Carmen Luppino

Fire Alarm Upgrade
Project Manager: Leonard Shanes

Classroom Renovations
Project Manager: Leonard Shanes

Flooring & Finishes Upgrades
-1st floor lobby
-Laundry room
Project Manager: Mike Haggerty

Bathroom Upgrades
Project Manager: Mike Haggerty

Step improvements
-Granite treads
-Snowmelt system
-New railings
Project Manager: Jim Blum

Roof Mechanical Equipment Modifications
Project Manager: Jim Alfiere

Suite 335 Interior Office Modifications
Project Manager: Kim Cirman

Atrium Window Gasket Restoration
Project Manager: Jim Alfiere

South Stairwell and Elevator Repairs
Project Manager: Carmen Luppino

Two-Way Directional Amplifier Installation
Project Manager: Carmen Luppino

ECS Classroom Technology Improvements
-CST 3-116
-Link 331
-Link 373
Project Manager: Doug Tankersley

SU Ambulance Covered Parking
-Q2 lot
Project Manager: Doug Tankersley

Mechanical Improvements
Project Manager: Carmen Luppino

 

Third Floor ADA Bathroom Upgrade
Project Manager: Kim Cirman

Minnowbrook Boathouse Repairs
Project Manager: Mike Haggerty

Television Production Studio
-Backup power & cooling
-Post-production feasibility study
-Precast concrete evaluation
-Emergency lighting
Project Manager: Jim Alfiere

NH 3 Food.com Window and East Window Wall Repair
Project Manager: Jim Alfiere

Bartlett Room Renovations
Project Manager: Jim Alfiere

ADA Bathroom Upgrades
Project Manager: Leonard Shanes

Fire Alarm Upgrades
Project Manager: Leonard Shanes

Acoustical Improvements – Rooms 016 and 018
Project Manager: James Peterson

2nd Floor Upgrades
-Carpet replacement
-Window treatments
-Paint
-Corridor benches
Project Manager: Doug Tankersley

1,2,&3 Flooring Upgrades
Project Manager: Tim Robinson

1,2,&3 Roof Coating
Project Manager: Tim Robinson

Renovations
Project Manager: Jim Alfiere

Down Flush Toilet Installation
-Winding Ridge 310, 400, 461
Project Manager: Tim Robinson

Exterior Stair & Landing Improvements
Project Manager: Tim Robinson

Replacement of Stairs, Landings and Sidewalks
Project Manager: Tim Robinson

Electronic Renovations Rooms 026 and 208
Project Manager: Carmen Luppino

Roof Replacements
-Buildings 311, 321, 371, 430, 440
Project Manager: Tim Robinson

Electrical Service Renovation
Project Manager: Carmen Luppino

Alco/Riley Fire Alarm Replacement
Alco 1964 Building Roof Replacement
Steam Vault D20 Replacement
Alco Plant 480V Electrical Service Upgrade
C200-C210 Anchor Steam Line Replacement
Crouse Hospital Steam Line Replacement
Steam Condensate Pipe Replacement
SUNY ESF Academic Research Building Steam/Condensate Relocation
Vault B80 & A80-B80 Tunnel Replacement
Project Manager: David Warren

Einhorn Family Walk – Promenade Furniture Installation
Project Manager: Jim Blum

Auditorium Upgrades
Project Manager: Leonard Shanes

Bus Stop Installations
Utility Expansion and Renewal
Euclid Ave. Restriping
Project Manager: David Warren

Falk College 4th Floor Library Build
Project Manager: Carmen Luppino

Gym “A” Air Conditioning System Installation
Project Manager: Carmen Luppino

Rec Services Relocations & Renovations
Project Manager: Carmen Luppino

Room 211 Renovations
Project Manager: Mark Hance